|
• Investments € 200 m
• Total area 40 hectares
• Site area over 90 (180) thousand m2
• Electric power consumption 7 (21) megawatt
• Gas consumption over 5 (7) m m3 annualy
• Water consumption 250 (500) m3 a day
• Commissioning 3rd quarter 2009
Major Facilities
• Production building
• Transport gallery
• 2 check-points and a weighbridge
Transformer station
• Traffic system (both motor roads and a branch line)
• Production utilities
• Landscaping incl. fencing
|
|
|
| |
| |
|
|
| |